SIEMENS
Fabrication, installation and commissioning of Piping Works Area 400 at PARCO Oil Refinery, Mehmoodkot. 1998-1999
GENERAL ELECTRIC / HPE
Fabrication and welding of HP, LP, IP piping on HRSG unit A at Uch power project. 1998
GENERAL ELECTRIC / HPE
Fabrication and installation of fire fighting systems on oil tanks and startup generator. 1998
GENERAL ELECTRIC / HPE
Installation and aluminum welding of ISO phase bus bars on gas turbines at Uch. Power Project. 1998
PAKISTAN ENGINEERING SERVICES
Fabrication, installation and welding of 2'' dia aluminum buss bar at Fauji Kabirwala power project. 1998