SIEMENS

Fabrication, installation and commissioning of Piping Works Area 400 at PARCO Oil Refinery, Mehmoodkot. 1998-1999
 
 
GENERAL ELECTRIC / HPE

Fabrication and welding of HP, LP, IP piping on HRSG unit A at Uch power project. 1998
 
 
GENERAL ELECTRIC / HPE

Fabrication and installation of fire fighting systems on oil tanks and startup generator. 1998
 
 
GENERAL ELECTRIC / HPE

Installation and aluminum welding of ISO phase bus bars on gas turbines at Uch. Power Project. 1998
 
 
PAKISTAN ENGINEERING SERVICES

Fabrication, installation and welding of 2'' dia aluminum buss bar at Fauji Kabirwala power project. 1998
 
 